Flue Solutions » FuranFlex » Installation Process
The following is a summary to provide insight into the FuranFlex® installation process:
|
![]() |
|
K1: monitor K2: camera |
|
![]() |
|
1. Steam generator 2. Water tank 3. Fast blowing unit 4. Upper stand 5. FuranFlex® 6. T-joint 7. Calibratiing ring |
|
![]() |
|
1. Steam generator 2. Water tank 3. Fast blowing unit 4. Upper stand 5. FuranFlex® 6. T-joint 7. Calibratiing ring 8. Upper adapter head 9. Lower adapter head 10. Air inlet pipe 11. Condensate drain pipe 12. Steam inlet pipe 13 – 14. Rope clamper |
|
![]() |
|
1. Steam generator 2. Water tank 3. Fast blowing unit 4. Upper stand 5. FuranFlex® 6. T-joint 7. Calibratiing ring 8. Upper adapter head 9. Lower adapter head 10. Air inlet pipe 11. Condensate drain pipe 12. Steam inlet pipe 13 – 14. Rope clamper |
|
![]() |
|
1. Steam generator 2. Water tank 3. Fast blowing unit 4. Upper stand 5. FuranFlex® 6. T-joint 7. Calibratiing ring 8. Upper adapter head 9. Lower adapter head 10. Air inlet pipe 11. Condensate drain pipe 12. Steam inlet pipe 13 – 14. Rope clamper |
|
![]() |
|
5. FuranFlex® 6. T-joint 7. Calibratiing ring 8. Upper adapter head 9. Lower adapter head 10. Air inlet pipe 11. Condensate drain pipe 12. Steam inlet pipe 13 – 14. Rope clamper 16. Saw |
|
![]() |
|
5. FuranFlex® liner 6. T-joint 7. Calibration ring 17. Condensate cleaning piece 18. Soot door 19. Upper closing piece |